PHASE 3 NEW CONSTRUCTION INSPECTION

Return to New Construction Inspection

Return to Phase 1 Foundation Inspection Criteria

Go Back To Home Page

Return to Phase 2 Foundation Inspection Criteria

FINAL INSPECTION CRITERIA

The grading of the yard surrounding the home appropriately allows water to flow away fro the home and comply with the TRCC performance standard

The electrical, plumbing and HVAC ( Heating, Ventillation and Air Conditioning) System is in complete working order

The exterior unit of the HVAC system (the compressor) should be located on a level surface above the ground

All air ducts should be free of obstruction.  Any dampers and control systems should be checked.

The doors and windows all operate properly
The finish materials are properly installed, sealed and protected from the environment

The flatwork around the home is free of any structural cracks, holes or other safety hazards

All roof cladding is installed in accordance with the manufacturer's recomendations

Flashing is installed

The stairways and hallways are of proper width and have adequate headroom, handrails, landings, and treads are the proper size and spacing

The home's fixtures (plumbing, electrical and finish hardware) are all correctly installed and working properly

Any appliances or manufactured products installed in the home are in proper working order

There are no apparrent safety issues